HONEYWELL HELPS BASF TURN HAZARDOUS WASTE INTO CLEAN ENERGY AT WORLD’S LARGEST CHEMICAL COMPLEX

Jan. 19, 2018
Honeywell (NYSE: HON) Process Solutions (HPS) today announced that BASF has opened a state-of-the-art control room equipped with Honeywell Experion® technology at its waste incineration complex in Ludwigshafen, Germany.

Honeywell (NYSE: HON) Process Solutions (HPS) today announced that BASF has opened a state-of-the-art control room equipped with Honeywell Experion® technology at its waste incineration complex in Ludwigshafen, Germany. The control room was officially inaugurated on November 28, 2017, by Dr. Uwe Liebelt, president, BASF European Site and Verbund Management, and Vimal Kapur, president of HPS.
Honeywell re-designed the plant’s control room with BASF’s Industrie 4.0 initiative in mind. Virtualization technology delivers consolidated plant information to operators via eight large-screen Experion® Orion Consoles, which also embed traditionally separate Microsoft® Office desktop applications alongside the distributed control system one. Two Experion® Collaboration Stations enable BASF to run production meetings more efficiently by using real-time data and online documents.
As part of Honeywell’s Experion® Process Knowledge System, 29 C300 Controllers and 20,000 I/O modules facilitate plant-wide monitoring, improve safety and fire protection, and increase reliability. In addition, a new MediluX lighting system in the control room improves visual conditions for operators day and night, reducing eye strain and fatigue.
“This strategic project is a prime example of how Industrie 4.0 is transforming industrial operations,” Kapur said. “Previously, BASF operators had to gather and piece together data to form a high-level view. Now, critical information is digitally consolidated and streamed onto central displays, transforming efficiency, productivity and decision-making.”
The plant’s six incinerators process hazardous waste that cannot be reused or recycled and convert it into steam and electrical power. The clean, reusable energy is channeled back into BASF’s production processes, helping the company save resources and reduce emissions.
“Thanks to excellent cooperation with Honeywell, our 60-year-old plant now has one of the most modern control rooms in the world,” said Dr. Karin Flore, head of waste incineration, BASF.
The incineration plant serves more than 200 BASF production facilities within the company’s flagship,10-square-kilometer production site as well as facilities outside the BASF complex. The reliability of the plant is critical to BASF’s wider production operations because any standstill could potentially affect the world’s largest chemical complex as a whole.

For more information, click here

Sponsored Recommendations

Strategizing for sustainable success in material handling and packaging

Download our visual factory brochure to explore how, together, we can fully optimize your industrial operations for ongoing success in material handling and packaging. As your...

A closer look at modern design considerations for food and beverage

With new and changing safety and hygiene regulations at top of mind, its easy to understand how other crucial aspects of machine design can get pushed aside. Our whitepaper explores...

Fueling the Future of Commercial EV Charging Infrastructure

Miguel Gudino, an Associate Application Engineer at RS, addresses various EV charging challenges and opportunities, ranging from charging station design strategies to the advanced...

Condition Monitoring for Energy and Utilities Assets

Condition monitoring is an essential element of asset management in the energy and utilities industry. The American oil and gas, water and wastewater, and electrical grid sectors...