Honeywell Automation, Safety Technology Selected for Central Asia-to-China Natural Gas Pipeline Project

May 6, 2014
Honeywell Process Solutions announced that its automation and safety technology has been selected for the third phase of a pipeline project supplying natural gas from Central Asia to China.
Honeywell (NYSE: HON) Process Solutions announced that its automation and safety technology has been selected for the third phase of a pipeline project supplying natural gas from Central Asia to China.
Asia Trans Gas selected Honeywell’s Experion Process Knowledge System (PKS) and Safety Manager technology to manage operations and to help prevent safety problems in a third pipeline to be built as part of the Central Asia-China Gas Pipeline (CACGP) project. The same Honeywell technology is in use in the first two pipelines of the project, which are already in operation. Asia Trans Gas is a joint venture of China National Petroleum Corp. (CNPC) and Uzbekistan national holding company, UzbekNefteGas.
“Pipelines present unique challenges because their length makes them more difficult for operators to monitor and respond to problems, but an integrated approach provides unparalleled visibility into their operations,” said Aldous Wong, regional general manager, Honeywell Process Solutions, Greater China. “The Honeywell system will increase operators’ access to information and help them make faster, better-informed decisions to promote the integrity and safety of the pipeline.”
Honeywell’s Experion PKS will be the main integration and control software platform for the 530-kilometer pipeline to give operators a complete view of how the pipeline is functioning. By integrating Honeywell’s Safety Manager software into the overall system, Experion will help improve safety practices such as emergency shutdowns, equipment protection, fire and gas monitoring, and critical control.
“Natural gas from Central Asia plays an important role in providing cleaner energy for China and we expect demand to grow at 8 percent per year,” said Li Lin, general manager, Asia Trans Gas. “Asia Trans Gas is pleased to continue to partner with Honeywell to manage these critical pipeline operations efficiently and safely.”
The third pipeline in the CACGP network, named Line C, will run in parallel with the existing twin pipelines, Lines A and B. The pipelines start in Turkmenistan and cut across Uzbekistan and Kazakhstan before reaching China's western Xinjiang province. The A and B lines, which were completed in 2009, also use Honeywell’s Experion PKS and Safety Manager. The existing main control center (MCC), which currently controls lines A and B, will be upgraded and become the control center for all three lines, leveraging Honeywell’s Distributed System Architecture (DSA).

Companies in this Article

Sponsored Recommendations

Full Line of DIN Rail Terminal Blocks Video

Altech offers an extensive line of DIN Rail Terminal Blocks including all major Connection Technologies available in the industry to meet requirements for a vast variety of applications...

The Value of Integrating DIN Rail Cylindrical Fuse Holders Into Your Designs

What short circuit currents do I have to consider when purchasing a DIN rail cylindrical fuse holder? That data is available from the manufacturer. For example, Altech cylindrical...

3 Lessons Learned From Battle-Tested Microgrid Experts

Hear from three experts on what they’ve learned by pioneering microgrids across the private and public sectors.

Wireless Data Acquisition System Case Studies

Wireless data acquisition systems are vital elements of connected factories, collecting data that allows operators to remotely access and visualize equipment and process information...