The system combines advanced measurement capability with in-situ calibration verification to lower operating costs in flare gas applications aboard offshore platforms, land-based oil/gas facilities and chemical plants. It is designed to comply with the US Minerals Management Service (MMS) mandate per final rule, 30 CFR Part 250, Subpart K, Section 250, stipulating that all domestic US offshore rigs processing more than an average of 2000 bopd must install flare/vent gas flow meters. The system allows for the verification of flow meter calibration in minutes without removing the meter from the pipe or process and makes it easy to meet process validation more effectively and comply with environmental regulation requirements.