Three-Phase Power Analyzer

March 1, 2017
Carlo Gavazzi is pleased to announce the new WM20 Three-Phase Power Analyzer, an exciting new product range targeted to assist manufacturers and end users in monitoring and managing escalating energy costs.

Carlo Gavazzi is pleased to announce the new WM20 Three-Phase Power Analyzer, an exciting new product range targeted to assist manufacturers and end users in monitoring and managing escalating energy costs. The WM20 is a modular class 0.5S (kWh) 3-phase power analyzer which can be used for single, two and three phase systems. It is capable of measuring most relevant instantaneous electrical variables, harmonic distortion, and energy generation or consumption.
Four versions are available to manage up to 600 VAC systems with a choice of either a one or five amp current transformer input. All information gathered is available on a large, bright LCD display and can be transmitted by one of the available communication protocols: including Modbus (RS-485, TCP/IP), BACnet, (RS-485, TCP/IP) and Profibus. The new ‘rotating pages’ function automatically shows all measurements in a sequence without having to scroll manually through the keypad. The WM20 Power Analyzer can be used as a stand-alone meter or be a part of the complete VMUC-based energy management system.
This analyzer can be used in a wide number of applications, ranging from building automation (for monitoring of the mains or sub-metering) to industrial automation (for monitoring variables and consumption of a single machine, or for the mains of an entire manufacturing facility).
The features of the WM20 Power Analyzers include:

• Modular meter
• Class 0.5S (kWh)
• Accuracy ±0.2% RDG (current/voltage)
• Comprehensive 4 line LCD display
• Optical port for programming and data logging
• Optional digital output module
• Alarms can be linked to relay outputs
• Optional communication module
• Choice of protocols; Modbus, BACnet, Profibus
• cULus listed and CE marked
• Free downloadable configuration

For more information, click here

Sponsored Recommendations

Meet our experts - Reduce complexity of a DCS Migration

Sign up for a complementary onsite assessment.

Revolutionizing Germany’s energy landscape: The Wilhelmshaven floating LNG terminal

The German LNG terminal lays the groundwork for future sustainable energy initiatives. Here's how Schneider Electric helped make it happen.

Navigating Distributed Control Systems Migration

Navigating Distributed Control System (DCS) migrations doesn't have to be as complex as it seems. Whether you are planning a migration or seeking to enhance ...

Revolutionize process safety with Tricon CX V12

The most versatile TÜV certified safety instrumented system. One system with a choice of architectures and form factors delivering a lifetime of safe, resili...